MenWomenStudio
Production Calendar

Three to five weeks. Confirmed at the moment of deposit.

We commit to the lead time you see at checkout. If anything changes during production, you hear from us — not the other way around.

3–5weeks

Standard production

10–14days

Sample turnaround

Day 0

Clock starts at deposit

Live

Status visible in dashboard

Production Stages

What happens in each week between deposit and dispatch. Every order moves through these six stages — you can see which stage your order is at, in real time, in the dashboard.

Day 0

Order Confirmed

Proforma invoice issued. 30% deposit cleared. Production slot reserved on the factory calendar.

Week 1

Material Cut

Pattern checked against the configuration. Hides selected from the dye lot, cut, and prepared. Components allocated.

Week 2

Upper Assembly

Closing — stitching of the upper, lining attachment, lasting onto the model's shoe last. The most labour-intensive stage.

Week 3

Bottoming

Sole attachment by the chosen construction (cemented, Goodyear-welted, Blake-stitched). Edges trimmed and finished.

Week 4

Finishing & QC

Hand-burnishing where specified. Final colour pass. Internal quality control on every pair against the spec sheet.

Week 5

Pack & Dispatch

Cotton bags, kraft outer, balance invoice issued. Carrier collection booked. Tracking shared the same day.

Lead time excludes transit. Add freight time from dispatch — typically 5–10 business days within Western Europe. See the Shipping & Customs page for region-by-region transit estimates.

What affects lead time

Standard catalogue, in-palette colour

Hits the 4-week mark. We hold capacity for these orders.

Single configuration, single model

Faster than multi-model orders because cutting and assembly are batched.

Custom leather (cordovan, exotics)

Adds 1–2 weeks for material lead time at the tannery.

Multiple component upgrades

Hand-burnishing, decorative welt, hand-stitching push finishing into a second week.

Orders > 200 pairs per configuration

Production sequencing across multiple last sets — typically adds one week.

Bespoke (off-platform pattern)

Not subject to standard lead time. Quoted per project — 6–10 weeks is typical.

Seasonal Capacity

Open

Jan – Apr

Full standard lead time. Pre-season buying for autumn/winter is the strongest fit for this window.

Tight

May – Aug

Capacity narrows around the European summer schedule. Plan an extra week of buffer for August deposits.

Heavy

Sep – Dec

Holiday and spring/summer cuts. Deposit in early September to guarantee in-window dispatch before year-end.

You see the same status the factory sees.

Every order has a live status in your dashboard mapped to the production stage above. You don't have to email to ask where the order is. If a stage takes longer than planned, the platform shows that — and you receive an email at the moment the dispatch ETA changes by more than two business days.

When 3–5 weeks isn't enough.

Express production is occasionally available against an air-freight surcharge for in-stock leathers — we don't promote it because it isn't always honest, but it exists. If you have a fixed in-store date, talk to us before placing the order rather than after.

Need a date in the calendar?

Send us your in-store target. We'll work backward and tell you the latest deposit date that hits it — before you commit.

Talk to Production →